Brief History
Introducing the footprint of HESI
Past and present are preparations for tomo rrow.
-
2020'
- 2024.03 10,000-ton class offshore wind transport barge (Hyundai Wind Carry) departure
- 2023.06 Departure of the 1,000-ton class large offshore wind turbine installation vessel (Hyundai Frontier)
- 2022.01 Former man wins contract for the construction/installation of a 100MW offshore wind power plant
- 2021.06 Export of 46 Substructures for Greater Changhua Offshore Wind Farm"
- 2021.06 Selection of National Project for Development of Pre-piling Technology in Offshore Wind Power
- 2021.04 Construction of a 14,000-ton large-scale offshore wind turbine installation vessel has commenced
- 2021.01 Signing of the Jeonnam-type Job Coexistence Agreement for the Establishment of Offshore Wind Power Plants
- 2020.12 Yulchon Plant Site Contribution in Kind (Hyundai Engineering & Construction)
- 2020.06 Signing of a Memorandum of Understanding for the Promotion of the Offshore Wind Power Industry
-
2010'
- 2019.06 Awarded the contract for the construction of substructures for Greater Changhua Offshore Wind Farm
- 2019.04 Establishment of a local corporation in Singapore for medium-sized leasing business
- 2018.12 Selected as a national project for the construction of a 14,000-ton class dedicated installation vessel for offshore wind power
- 2018.05 Manufacturing and installation of offshore substations and substructures for the Southwest Sea offshore wind power demonstration complex
- 2017.10 Manufacturing and installation of the Sheikh Jaber Causeway bridge in Kuwait (suspension bridge)
- 2016.12 Fabrication and installation of steel structures for the BNPP nuclear power plant in the UAE (plant steel structure)
- 2016.12 Fabrication and installation of the super high-rise building for Lotte World Tower (architectural steel structure)
- 2016.05 Fabrication and installation of the Third Bosphorus Bridge in Turkey (suspension bridge)
- 2016.05 Construction of a 5,500-ton jack-up barge (special vessel)
- 2016.05 Manufacturing and delivery of a 20,000-ton floating dock
- 2015.11 Expansion of the painting section at Yulchon Factory
- 2015.08 Acquisition of Grade 1 certification for steel structure manufacturing factory from the Ministry of Land(Cheonan Plant 1)
- 2014.11 Headquarters relocation (Cheongju, Seonggeo-eup, Cheonan-si, Chungcheongnam-do, Cheongheung Industrial Complex)
- 2014.06 Withdrawal from Incheon Manufacturing Plant (Incheon Namhang)
- 2013.07 Opening of Cheonan Plant 1 (acquisition of the former Dong-A Construction Industry Cheonan Plant)
- 2011.12 Completion of the manufacturing plant (processing plant) at Yulchon Factory
- 2011.04 Incorporation into Hyundai Motor Group | Entry into construction equipment rental business
- 2010.07 Entry into construction equipment rental business
-
2000'
- 2009.05 Completion of port facilities at Yulchon Factory
- 2008.02 Completion of the painting section at Yulchon Factory
- 2007.05 Commencement of construction at Yulchon Factory
- 2002.08 Export of bridge structures overseas (to the United States)
- 2002.05 Change of name to Hyundai Steel Industry
- 2002.06 Spin-off from Hyundai Construction to Hyundai Steel Tube
-
1990'
- 1999.09 Acquisition of Grade 1 certification for steel structure manufacturing factory from the Ministry of Land
- 1999.02 Expansion of the Steel Tube Business Division at Cheonan Plant
- 1995.09 Establishment of Daesan Plant
- 1992.04 Acquisition of "A" class certification for Japanese steel frame production factory
- 1991.12 Acquisition of NATIONAL BOARD "R" STAMP
-
1980'
- 1985.12 Korea Machinery Industry Association Company Registration
- 1980.02 Steel Structure Export (Middle East)
-
1970'
- 1979.02 Establishment of Hyundai Construction Steel Business Division